Lianggong Climbing Fomwork with Platform for Bridge Pier Construction
HomeHome > Products > Bridge Platforms > Lianggong Climbing Fomwork with Platform for Bridge Pier Construction
Lianggong Climbing Fomwork with Platform for Bridge Pier Construction

Lianggong Climbing Fomwork with Platform for Bridge Pier Construction

Product Description Cantilever climbing formwork (CB180&CB240) Cantilever climbing formwork, CB-180 and CB-240, are main
Basic Info.
Model NO. Climbing Formwork
Transport Package Standard Package
Specification 12-15
Trademark LIANGGONG
Origin China
Production Capacity 400sets/Month
Product Description

Product Description

Cantilever climbing formwork (CB180&CB240)

Cantilever climbing formwork, CB-180 and CB-240, are mainly used for large-area concrete pouring, such as for dams, piers, anchors, retaining walls, tunnels and basements. The lateral pressure of concrete is borne by anchors and wall-through tie rods, so that no other reinforcement is needed for the formwork. It is featured by its simple and quick operation, wide range adjustment for one-off casting height, smooth concrete surface, and economy and durability.The cantilever formwork CB-240 has lifting units in two types: diagonal brace type and truss type. Truss type is more suitable for the cases with heavier construction load, higher formwork erection and smaller scope of inclination.The main difference between CB-180 and CB-240 is the main bracket. The width of main platform of these two systems is 180 cm and 240 cm respectively.

Lianggong Climbing Fomwork with Platform for Bridge Pier Construction


Lianggong Climbing Fomwork with Platform for Bridge Pier Construction


Lianggong Climbing Fomwork with Platform for Bridge Pier Construction


Products Show

Lianggong Climbing Fomwork with Platform for Bridge Pier Construction


Lianggong Climbing Fomwork with Platform for Bridge Pier Construction


Characteristics

Packing & Delivery
Packing:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
Our Service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Our Company

Customer Photos

FAQ
Q: Are you trading company or manufacture?
A:We are factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer the sample for free but you need pay for the freight cost.
Q: What's your payment term
A: ≤ $1,000, 100% inadvance, ≥$1,000, 30% TT in advance, balance before shipment.
If you have another question, please feel free to contact us !