Lainggong Shaft Beam Platform for Elevator Equipment Stairwell Core Wall Elevator Formwork for Construction
HomeHome > Products > Elevator Installation Platforms > Lainggong Shaft Beam Platform for Elevator Equipment Stairwell Core Wall Elevator Formwork for Construction
Lainggong Shaft Beam Platform for Elevator Equipment Stairwell Core Wall Elevator Formwork for Construction

Lainggong Shaft Beam Platform for Elevator Equipment Stairwell Core Wall Elevator Formwork for Construction

Product Description Shaft Beam Platform Shaft platform is mainly used for concrete casting of shaft of high-rise buildin
Basic Info.
Model NO. Shaft Beam Platform
Advantage Easy, Rapid and Economical
Weight 74.54-320
Length Same as The Length of Timber Beam
Color Customized
Transport Package Standard Packing
Trademark LIANGGONG
Origin China
Production Capacity 100 Sets/Months
Product Description

Product Description

Shaft Beam Platform


Shaft platform is mainly used for concrete casting of shaft of high-rise buildings, such as elevator, equipment shaft and stairwell. The lateral pressure of concrete is mainly borne by the wall-through tie rod, and the shaft beam platform has the advantages of being simple, quick and economic in operation.Products Show
Introduce to the systemShaft beam platform consists of platform board, timber beam, clamp, shaft beam and anchor.The structure drawing is as follows:In the drawing, L is the length of timber beam and W is adjustable. Shaft beams are in a few specifications, ranging from 1.45m to 5.8m, being adapted to widths of different shafts, and selected as per need.
Shaft beam platform lifting
The platform and formwork must be hoisted separately. First, lift the formwork, and then the platform. When the platform is in place, the claw of the shaft beam must be fixed tightly on the tensile bolt.Used together with the climbing formwork
The shaft beam platform should be used with other formwork system in construction process. The picture on the below is the diagram of collaboration of shaft beam platform and cantilever formwork CB-240.Packing & Delivery
Packing:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles:Timber beam, steel props, tie rod, etc.
---Pallet:Small parts will be put in bags and then on pallets.
---Wooden cases:It is available on customer's request.
---Bulk:Some irregular goods will be loaded in bulk in container.
Delivery:
1.Production: For full container, normally we need 20-30 days after receive customer's down payment.
2.Transportation: It depends on the destination charge port.
3.Negotiation is needed for special requirements.
Our Service
1.Consulting,Design,and QuotationOffer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and ShipmentFrom fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instructionIf you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Our Company
Customer Photos

Lainggong Shaft Beam Platform for Elevator Equipment Stairwell Core Wall Elevator Formwork for Construction


FAQ
Q: Are you trading company or manufacturer ?
A: We are factory
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.
Q: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD,100% in advance.Payment>=1000USD,30% T/T in advance,balance before shippment. If you have another question, please feel free to contact us !